Spring has most definitely sprung here in the Pioneer Valley, and amidst the riotous blossoming there is much activity. Dietz Construction has arrived to dig up and divert some underground drainage piping so that they can put in the new access road. The truth is, the digging has been going on for days but those of us whose offices are eye-level with all the action have not been able to discern the purpose until today. As a small crane lowered a huge cement cylinder into the big hole back where the loading dock used to be, one of my coworkers speculated out loud that perhaps the Book Center was finally installing that hot tub we’ve been asking for? But no. It’s all about drainage, at this point.
-Jillian



